
A turnkey project built by Studio Associato Unigruppo Impianti, the new building will be used for offices and warehouses and takes the form of a 139x134m parallelipiped.
Special care had to be taken to contain the water table and waterproof the building. With the aid of a big drainage system, a continuous wrapper was constructed outside the concrete structure of the building itself. A ribbed foundation was then created by thickening the cast to create true bulbs at the points where the pillars rise.